All Jobs Vacancy

Oracle Primavera Unifier 26 Admin

Posted 6 days ago by Innosoul inc

Summary: The role is for a Remote Oracle Primavera Unifier 26 Administrator/.Net Developer, requiring extensive experience with Oracle Primavera Unifier, various programming languages, and database management. The position involves maintaining and supporting Oracle Primavera Unifier, creating applications, and assisting with user support. The candidate must possess strong communication skills and be able to collaborate effectively with existing staff and contractors. This is a 12-month engagement based in Jackson, MS.

Key Responsibilities:

  • Maintain and support Oracle Primavera Unifier Version: 26.6 and higher.
  • Make changes to existing business processes, data views, user-defined reports, and BI custom prints.
  • Identify configuration defects and assist application administrators with first-level user support.
  • Maintain existing ASP code for the reservations portal and the DFA Bureau of Buildings project listing web pages.
  • Support existing staff with the administration and maintenance of Oracle Primavera Unifier.
  • Create a new web application for DFA's existing reservation system integrated with Primavera Unifier.

Key Skills:

  • Four-year degree in Computer Science, Information Technology, or related field.
  • Seven years of experience with Oracle Primavera Unifier (Version: 26 required).
  • Seven years of experience creating applications in multiple programming languages.
  • Five years of database design and administration experience.
  • Five years of experience with application and database security, privacy, and compliance.
  • Advanced knowledge of Visual Studio, VB.NET, .NET Framework, and .NET CORE programming.
  • Proficient with SQL, IIS configuration, and Windows Server versions 2016 through 2025.
  • Excellent English-speaking and written communication skills.

Salary (Rate): undetermined

City: undetermined

Country: undetermined

Working Arrangements: remote

IR35 Status: undetermined

Seniority Level: undetermined

Industry: IT

Detailed Description From Employer:

Job ID: MS-160874

Remote Oracle Primavera Unifier 26 Admin/.Net Developer with CORE, VB.Net, C#, SQL Server, Windows/IIS Admin, Drupal, MySQL, ASP.net, Blazor/Razor Pages (both must) experience

Location: Jackson, MS (DFA)
Duration: 12 Months

Required Skills/Experience
To be considered, all proposed consultants must meet the following mandatory requirements:
A four-year degree from an accredited school in Computer Science, Information Technology, or like field.
Seven (7) years or more of direct experience with Oracle Primavera Unifier (Version: 26 experience is required)
Seven (7) years or more of direct and specific experience creating applications in multiple programming languages
Five (5) years or more of direct database design and administration.
Five (5) years or more of experience with application and database security, privacy, and compliance decisions.
Advanced knowledge of Visual Studio to include the use of Visual Studio 2026 version 18.7.2
Advanced knowledge of VB.NET, .NET Framework, .NET CORE programming
Advanced knowledge of Structured Query Language (SQL), and SQL database
Proficient with IIS configuration
Proficient with Windows Server versions 2016 through 2025
Advanced knowledge of C#
Documentation and knowledge transfer experience.
Excellent English-speaking skills, written communication skills, and knowledge transfer skills

Preferred/Not Required
Drupal Content Management System versions 10 and 11, and web application development and the ability to publish web applications via Visual Studio to IIS.

Operating Systems
Windows Server Intermediate Preferred Versions 2016, 2019, 2022, 2025
Programming Language/Development Tools
.NET Advanced Preferred
.NET CORE SME Required
C# SME Required
Database Systems/Database Tools
Oracle SQL Advanced Required
MySQL Advanced Required
Framework/SLD/Methodology
ASP.NET Advanced Required
Blazor Advanced Required
Razor Pages Advanced Required

Position Description and Job Skill Set
Maintain and support Oracle Primavera Unifier Version: 26.6 and higher; making changes to existing business processes, data views, user defined reports, BI custom prints, etc. Ability to identify configuration defects and make the necessary corrections and to assist application administrators with first level user support. Also responsible for maintaining existing ASP code for the reservations portal and the DFA Bureau of Buildings (BOB) project listing web pages.

This engagement will have two primary objectives. First, to support existing staff with the administration and maintenance of Oracle Primavera Unifier and support the DFA business owners within the Bureau of Building, Grounds, and Real Property Management. Secondary but of equal importance, the creation of a new web application for DFAs existing reservation system currently integrated with Primavera Unifier.

Thorough knowledge of Oracle Primavera Unifier, .NET Framework 4.0.0, ASP.NET (VB.NET), .NET Core 8 through 10, Windows Server versions 2025, 2022, 2019, and 2016, IIS, Microsoft SQL required. Drupal 10 and 11 CMS knowledge would be a plus, as ultimately Reservations will be accessed via the DFA website. The person selected will be expected to upgrade the existing Reservation code from .Net Core 8 to 10. This will be a collaborative process requiring working closely with existing staff and other contractors, so communication, cross training, and flexibility in priorities and working with deadlines are required.

Rate:
£0/year
Location:
Remote
IR35 Status:
Undetermined
Remote Status:
Remote
Industry:
IT
Seniority Level:
Not Specified

Take-Home Pay

Not Available

Visit calculators for additional details

Create a free account to view the take-home pay for this contract

Share job